Tank construction
We build the steel shell, roof structure, platforms, ladders and complete tank equipment.



Pump rooms and water tanks
01 / Responsibility
The water reserve must be dependable.
The pump room must deliver it at the required parameters.
The tank, pumps, valves and controls form one fire water supply.
02 / How we work
We build the steel shell, roof structure, platforms, ladders and complete tank equipment.

We carry out internal work and install nozzles, filling systems, overflows and level controls.

We combine pumps, manifolds, valves, power and controls into one operational system.

We fill the tank, test the controls and confirm pump performance under load.

03 / Scope

04 / Selected project
Complete systemA steel tank and pump house providing an independent water supply for the facility’s fire protection systems.
05 / Questions
Yes. Capacity is based on water demand, the selected standard and the required operating duration of protected systems.
Yes. We provide inspections, tests, diagnostics and repairs of the mechanical and control systems.
We begin with the available documentation and a discussion about the facility. We then define the scope, schedule and a transparent quotation.
Yes. We phase the work and agree all shutdowns to minimise disruption to production, logistics or daily operations.
KAPEO Polska / New project
Design. Prefabrication. Installation. Service.
Contact us +48 721 933 111